RFCC Unit Revamping and Rehabilitation Project

Energy industries

RFCC Unit Revamping and Rehabilitation Project

RFCC Unit Revamping and Rehabilitation Project at Imam Khomeini Shazand Oil Refinery, Arak

Industrial project
Projects

Project overview

RFCC Unit Revamping and Rehabilitation Project

Imam Khomeini Shazand Oil Refinery, Arak, Iran

The RFCC (Residue Fluid Catalytic Cracking) Unit Revamping and Rehabilitation Project was carried out at the Imam Khomeini Shazand Oil Refinery, Arak. The RFCC Unit, with a production capacity of approximately 8 million liters of Euro 4 gasoline per day, together with other valuable products including diesel fuel and LPG, is the only RFCC unit in Iran and one of the largest facilities of its kind worldwide.

The revamping and rehabilitation works were successfully executed by Petrosaz. The project involved the mobilization of more than 250 international specialists from South Korea, Indonesia, and India, together with over 700 highly qualified Iranian professionals. Heavy lifting operations were supported by specialized equipment, including a 1,250-ton crawler crane. The entire shutdown, revamping, inspection, installation, and recommissioning activities were completed within four months.

Scope of Work

  1. Planning

Comprehensive planning and scheduling of all shutdown activities, ranging from routine maintenance tasks to the most complex engineering and construction operations.

  1. Engineering

Preparation and implementation of detailed Method Statements covering all major equipment and systems, including:

  • Reactor
  • Regenerator
  • Orifice Chamber
  • Slide Valves
  • Expansion Joints
  • TSS (Third Stage Separator)
  • FSS (Fourth Stage Separator)
  1. Inspection and Quality Control

Execution of comprehensive inspection and quality assurance activities in accordance with the approved QC Plan, including non-destructive examinations (NDE):

  • PT (Liquid Penetrant Testing)
  • MT (Magnetic Particle Testing)
  • VT (Visual Testing)
  • UT (Ultrasonic Testing)
  • PWHT (Post Weld Heat Treatment Inspection)
  • RT (Radiographic Testing)
  1. Fabrication and Installation

Reactor

Complete replacement and installation of the reactor internals, including:

  • Reactor Riser Internals
  • Disk-and-Donut Trays
  • VSS (Vortex Separation System)
  • Chamber
  • Cyclones
  • Flapper Valves

Regenerator

Major rehabilitation activities included:

  • Replacement of Cyclones
  • Replacement of Splash Plates
  • Replacement of Trickle Valves
  • Replacement of Steam Distributor
  • Removal of the existing Catalyst Cooler and installation of a new Catalyst Cooler
  • Complete replacement of Vent Tubes
  • Complete refurbishment of the First-to-Second Stage Separator Head
  • Repair and reinforcement of Regenerator shell hot spots

Orifice Chamber

  • Fabrication and installation of perforated dished heads
  • Modification of Diverter Valves
  • Overhaul of Slide Valves
  • Replacement and installation of Expansion Joints throughout all connecting lines

Mechanical Completion and Commissioning

Following completion of all mechanical works and successful inspections in accordance with the approved QC Plan, the RFCC Unit was recommissioned and returned to operation using the ICAPS commissioning management system, ensuring safe startup and reliable operational performance.

Image gallery

عملیات نوسازی و بازسازی واحد RFCC
عملیات نوسازی و بازسازی واحد RFCC
عملیات نصب تجهیزات سنگین در واحد RFCC
عملیات نصب تجهیزات سنگین در واحد RFCC
عملیات باربرداری فوق‌سنگین با جرثقیل ۱۲۵۰ تنی
عملیات باربرداری فوق‌سنگین با جرثقیل ۱۲۵۰ تنی

Key facts

Scope & disciplines
Oil RefiningRevampingProcess EquipmentOil & GasEPCPlant OverhaulEngineering & ConstructionRFCC Unit
Delivered on schedule
HSE standards upheld
Modern delivery practices